| PAPER-BASED PROCEDURE | ||
|
RESPONSIBLE AGENCY
Ministry of Industries and Production/ Chief Inspector of Boilers Address: 1st Floor, A Block Pak Secretariat, Islamabad, Pakistan Phone: 051-9104020 Email: N/A Website: http://www.moip.gov.pk
|
||
|
FEE Minimum Fee= Not Available Maximum Fee= Not Available |
PROCESSING TIME Minimum = Not Available Maximum = Not Available |
VALIDITY Not Available |
|
REQUIRED DOCUMENTS |
||
|
Application on letter head |
||
|
PROCESS STEPS STEP 1: The importer has to submit the application on Letterhead to the Chief Inspector of Boilers. STEP 2: The officer assessed and examine the application if the officer rejected the application the importer has to resubmit the application. STEP 3: If all the details are verified and completed, the officer releases order for port clearance STEP 4: Importer receives the Release Order.
|
||
|
PROCESS MAP
|
||
| # | عنوان | تفصیل | جاری کیا گیا | فائل |
|---|
| # | نام | تفصیل | Measure Type | ایجنسی | تبصرے | Legal Document | جواز بطرف | Measure Class |
|---|---|---|---|---|---|---|---|---|
| 1 | Release NOC for Imported Used Boilers [Chief Inspector of Boilers] | Release NOC of imported consignment for Boilers serves as the official document for the clearance of imported consignment of boilers and related components. | سرٹیفکیٹ کی شرائط | Chief Inspector of Boilers | Application on a letterhead needs to be submitted to the Chief Inspector of Boilers for scrutiny and assessment of the case. If the application is complete, the Chief Inspector of Boiler issues the Release Order for clearance of consignment at the port. | Import Policy Order 2022 | 9999-09-09 | Good |
