PAPER-BASED PROCEDURE

RESPONSIBLE AGENCY

Engineering Development Board (EDB)

Address:  EDB Complex Building, 5A Constitution Ave, F-5/1 F-5, Islamabad

Phone: (051) 9205595

Website: engineeringpakistan.com

FEE

 Fee= N/A

 

PROCESSING TIME

Maximum = 3 months

 

VALIDITY

1 Year

REQUIRED DOCUMENTS

  1. Technical assistance agreement with the foreign principal, if any.
  2. List of plant/machinery/equipment with complete specification, make/model, local/imported, if imported, name of the company as defined in 'Annexure-A' of the SRO.
  3. Purchase documents of plant/machinery/equipment installed as in-house facilities.
  4. Snaps of in-house facilities e.g., engine assembly & testing, vehicle final assembly, paint shop, vehicle performance testing facilities and inspection equipment etc.
  5. Copies of Sales Tax Certificate (STN) containing the status as importer-cum assembler or manufacturer & National Tax Number (NTN) certificates in the name of the company.
  6. Product(s) brand name to be assembled/manufactured in-house with a copy of Trademark Registration Certificate or acknowledgement receipt issued by the IPO/Trademark Registry office.
  7. Proof of factory premises ownership or copy of lease agreement, if premises on rent.
  8. Complete factory map /lay out.
  9. Complete address of the factory and registered office with phone, fax and e-mail etc.
  10. Name of the Chief Executive / Managing Director or an authorized officer of the firm for correspondence with EDB.
  11. List of 100% parts with %age index constituting a complete vehicle as per the attached Format-1 and comprising off:
    1. Importable components.
    2. Localized components to be procured from the vendors with their name’s contacts against each item.
    3. List of components to be manufactured in-house.
    4. Comparison of parts with parts contained under SRO 693(1)/2006.
  12. List of CKD parts to be imported under condition (iii) of the SRO for verification as per attached Format-II.
  13. List of vendors’ components to be purchased with complete description of items from the local vendors along with their complete addresses, phone, fax, email etc.
  14. Manpower breaks up as technical/non-technical, if any.
  15. Parts catalogue of vehicle duly signed and stamped.
  16. A NOC from the Municipal Committee / Town Committee.
  17. Copy of the registration of firm with SECP in case of Private Limited or Public Limited company and registration with The Registrar of Firms in case of AOP.

 

PROCESS STEPS

STEP 1: Assembler submits registration application along with supporting documents including list of components to be imported as per Annex-B of SRO 656 (I) / 2006 dated 22.06.2006 to receive manufacturing certificate and the quota for import of components under the said SRO. The list of documentary requirement is mentioned above.

STEP 2: Upon receipt of application, Desk Officer from Engineering Development Board (EDB) evaluates application, and all attached supporting documents.

STEP 3:In case EDB officer – Assistant Manager/Deputy Manager finds any deficiencies through the evaluation process; the officer may call additional documents/information from the Assembler and the Assembler submits the requisite documents/information.

STEP 4: After successful evaluation process, EDB designated Officer verifies the documents attached with the application and submits the file to General Manager for approval to conduct physical examination

STEP 5:After approval from the General Manager, EDB designated officer along with EDB team and representatives of other relevant agencies conducts physical inspection of the manufacturing premises.

STEP 6: In case physical inspection results are satisfactory, EDB Assistant Manager/Deputy Manager submits the report as well as proposal for issuance of Manufacturing Certificate and quota for approval from the General Manager.

STEP 7: After the approval from General Manager, EDB Assistant Manager/Deputy Manager Issues Manufacturing certificate / Import Quota for list of components to the Assembler Agent and at the same time feeds the approved quota list into the WeBOC.

STEP 8: For Approval from the Chief Executive Officer, the Officer Incharge refers the Import Quota request ‘Next Level’. After approval from EDB-CEO, EDB Assistant Manager/Deputy Manager Issues Manufacturing certificate, Import Quota for list of components to the Assembler and at the same time feeds the approved quota list into the WeBOC. In case of rejection, EDB-CEO provides feedback/remarks and reverts the request to the General Manager.

PROCESS MAP

 

 

Forms
# Title Description Issued By File
Measures
# Name Description Measure Type Agency Comments Legal Document Validity To Measure Class
1 Registration & Issuance of Import Quota of Components under SRO 656 (I)/2006 Dated 22.06.2006 Registration & Issuance of Import Quota of Components under SRO 656 (I)/2006 Dated 22.06.2006 with Engineering Development Board (EDB) Registration Requirement Engineering Development Board Registration & Issuance of Import Quota of Components under SRO 656 (I)/2006 Dated 22.06.2006 with Engineering Development Board (EDB) S.R.O. 656(I)/2006 date 22-06-2006 9999-09-09 Good